Skip to content

John Nagel

My feedback

1 result found

  1. 1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    An error occurred while saving the comment
    John Nagel commented  · 

    Thanks for the response!

    Follow up question: By "before the application of traffic" do you mean open to the public or before the concrete sets enough to be drive on? Our sensor could be mounted on the back of construction equipment while other sections of the road are being worked on. I believe concrete sets enough to drive on in 2-3 days? If the real-time data is desired before the concrete sets enough to be driven on then our solution would require other means of transport/holding.

    John Nagel shared this idea  · 

Feedback and Knowledge Base