1 vote1 comment · U.S. DOT FY 2026 Phase I Pre-Solicitation Q&A » 26-FH1: Edge AI-V2X Integrated Practical Solutions for Congestion Prevention and Mitigation · Admin →
An error occurred while saving the comment -
1 vote1 comment · U.S. DOT FY 2026 Phase I Pre-Solicitation Q&A » 26-FH1: Edge AI-V2X Integrated Practical Solutions for Congestion Prevention and Mitigation · Admin →
An error occurred while saving the comment
Du, Lili
commented
Please refer to the response to "Hardware-in-the-loop testbed expectations". Mainly, 2) Hardware-in-the-loop simulation testing is required in Phase I to demonstrate the feasibility of the architecture, critical components, and evaluate the benefits in traffic congestion mitigation under different scenarios. Virtual-only simulation may be acceptable where the proposed architecture is purely software- or firmware-based; however, the selected simulation approach should still credibly demonstrate system functionality and performance under representative conditions consistent with the Phase I objectives.
-
1 vote1 comment · U.S. DOT FY 2026 Phase I Pre-Solicitation Q&A » 26-FH1: Edge AI-V2X Integrated Practical Solutions for Congestion Prevention and Mitigation · Admin →
An error occurred while saving the comment
Du, Lili
commented
Offerors are encouraged to leverage legacy data but are free to incorporate any other accessible data sources they deem necessary and support Phase II implementation.
-
1 vote1 comment · U.S. DOT FY 2026 Phase I Pre-Solicitation Q&A » 26-FH1: Edge AI-V2X Integrated Practical Solutions for Congestion Prevention and Mitigation · Admin →
An error occurred while saving the comment
Du, Lili
commented
The choice is left to the proposer according to the proposed system and approaches for local congestion mitigation.
-
1 vote1 comment · U.S. DOT FY 2026 Phase I Pre-Solicitation Q&A » 26-FH1: Edge AI-V2X Integrated Practical Solutions for Congestion Prevention and Mitigation · Admin →
An error occurred while saving the comment
Du, Lili
commented
C-V2X is considered as the baseline and DSCR is not preferred unless with strong justification.
-
1 vote1 comment · U.S. DOT FY 2026 Phase I Pre-Solicitation Q&A » 26-FH1: Edge AI-V2X Integrated Practical Solutions for Congestion Prevention and Mitigation · Admin →
An error occurred while saving the comment
Du, Lili
commented
1) There is no preferred hardware-in-the-loop (HIL) testbed specified for Phase I. The proposers are encouraged to use the best testbed fitting the proposed integrative design.
2) Hardware-in-the-loop simulation testing is required in Phase I to demonstrate the feasibility of the architecture, critical components, and evaluate the benefits in traffic congestion mitigation under different scenarios. Virtual-only simulation may be acceptable where the proposed architecture is purely software- or firmware-based; however, the selected simulation approach should still credibly demonstrate system functionality and performance under representative conditions consistent with the Phase I objectives. -
1 vote1 comment · U.S. DOT FY 2026 Phase I Pre-Solicitation Q&A » 26-FH1: Edge AI-V2X Integrated Practical Solutions for Congestion Prevention and Mitigation · Admin →
An error occurred while saving the comment
Du, Lili
commented
See the response to Hardware-in-the-loop testbed expectations
There is no preferred hardware-in-the-loop (HIL) testbed specified for Phase I. The proposers are encouraged to use the best testbed fitting the proposed integrative design.
-
1 vote1 comment · U.S. DOT FY 2026 Phase I Pre-Solicitation Q&A » 26-FH1: Edge AI-V2X Integrated Practical Solutions for Congestion Prevention and Mitigation · Admin →
An error occurred while saving the comment
Du, Lili
commented
The designed system in Phase I shall satisfy all the privacy and data protection standards and regulation when they apply. some proven commercial-off-the-shelf products may be considered and proposed in Phase I.
-
1 vote1 comment · U.S. DOT FY 2026 Phase I Pre-Solicitation Q&A » 26-FH1: Edge AI-V2X Integrated Practical Solutions for Congestion Prevention and Mitigation · Admin →
An error occurred while saving the comment
Du, Lili
commented
This project focuses on vehicle-oriented events and the relevant traffic congestion mitigation. VRU may be considered in proper context in Phase II, but it is not the focus of this project in Phase I.
-
1 vote1 comment · U.S. DOT FY 2026 Phase I Pre-Solicitation Q&A » 26-FH1: Edge AI-V2X Integrated Practical Solutions for Congestion Prevention and Mitigation · Admin →
An error occurred while saving the comment
Du, Lili
commented
There is no preferred congestion type. Proposals should demonstrate a technically sound and scalable approach for handling congestion mitigation in a local area. Proposers are encouraged to choose congestion type (s) to address with their innovative systems.
-
1 vote1 comment · U.S. DOT FY 2026 Phase I Pre-Solicitation Q&A » 26-FH1: Edge AI-V2X Integrated Practical Solutions for Congestion Prevention and Mitigation · Admin →
An error occurred while saving the comment
Du, Lili
commented
There are no preferred baselines or units. Proposers are encouraged to propose and adopt most proper benefit-cost analysis to determine if it is a sound investment and 2) see how it compares with alternate projects including doing nothing. The proposer may refer to this reference: https://ops.fhwa.dot.gov/plan4ops/focus_areas/analysis_p_measure/benefit_cost_analysis.htm
-
1 vote1 comment · U.S. DOT FY 2026 Phase I Pre-Solicitation Q&A » 26-FH1: Edge AI-V2X Integrated Practical Solutions for Congestion Prevention and Mitigation · Admin →
An error occurred while saving the comment
Du, Lili
commented
Please see the responses to "Connected-vehicle *********** assumptions" and "Cost-benefit analysis baseline".
-
1 vote1 comment · U.S. DOT FY 2026 Phase I Pre-Solicitation Q&A » 26-FH1: Edge AI-V2X Integrated Practical Solutions for Congestion Prevention and Mitigation · Admin →
An error occurred while saving the comment
Du, Lili
commented
There is no preferred threshold. Proposers are encouraged to utilize a reasonable number of discrete benchmarks that effectively illustrate the designed system's functionality and applicability in the selected deployment environment. Proposers may assume that increasing CV *********** rates in the future would further improve system performance and accuracy.
-
1 vote1 comment · U.S. DOT FY 2026 Phase I Pre-Solicitation Q&A » 26-FH1: Edge AI-V2X Integrated Practical Solutions for Congestion Prevention and Mitigation · Admin →
An error occurred while saving the comment
Du, Lili
commented
There is not preferred scope. The proposers are encouraged to explore the best format fitting the proposed integrative system. Any advisories delivered from the system to the users requiring human interpretation and responses will be considered in the scope. These may include, but are not limited to, text-based messages, visual displays, voice prompts, in-vehicle dashboard or onboard unit (OBU) interfaces, and mobile-device-based notifications. Integration with consumer-facing mobile or vehicle interface platforms may also be considered within scope if such integration supports the proposed concept and enhances advisory delivery effectiveness. Proposals should clearly describe the intended advisory delivery methods and how they support usability, safety, and timely driver response.
-
1 vote1 comment · U.S. DOT FY 2026 Phase I Pre-Solicitation Q&A » 26-FH1: Edge AI-V2X Integrated Practical Solutions for Congestion Prevention and Mitigation · Admin →
An error occurred while saving the comment
Du, Lili
commented
There is no minimum spatial coverage set. The proposers are encouraged to choose the dynamic or static spatial scope best fitting the capability of the designed system, achieving project objectives in preventing or mitigating congestion in a local or regional area, encompassing multiple intersections and roadways.
-
1 vote1 comment · U.S. DOT FY 2026 Phase I Pre-Solicitation Q&A » 26-FH1: Edge AI-V2X Integrated Practical Solutions for Congestion Prevention and Mitigation · Admin →
An error occurred while saving the comment
Du, Lili
commented
The proposers may propose the state or local agency with which they intend to collaborate for access to live traffic data and support for system demonstration activities. The proposer is generally expected to establish and coordinate these partnerships directly as part of the proposed Phase II approach. If necessary USDOT will assist in facilitating or brokering access to relevant agency data sources.
-
1 vote1 comment · U.S. DOT FY 2026 Phase I Pre-Solicitation Q&A » 26-FH1: Edge AI-V2X Integrated Practical Solutions for Congestion Prevention and Mitigation · Admin →
An error occurred while saving the comment
Du, Lili
commented
There is no preference for one-way or two-way broadcast architecture. Offerors are encouraged to select the communication architecture that best supports the proposed congestion mitigation approach, with emphasis on effectively disseminating operational advisories to reduce local congestion and prevent its propagation to surrounding areas.
-
1 vote1 comment · U.S. DOT FY 2026 Phase I Pre-Solicitation Q&A » 26-FH1: Edge AI-V2X Integrated Practical Solutions for Congestion Prevention and Mitigation · Admin →
An error occurred while saving the comment
Du, Lili
commented
There is no stated preference among specific technologies. The choice is left to the proposer; selection should be based on considerations such as cost, latency, security, scalability, and expected users. Proposals that utilize novel or proprietary communication approaches may be considered responsive, provided within budget, having strong justification, and presenting great potential to find government partners in Phase II.
-
1 vote1 comment · U.S. DOT FY 2026 Phase I Pre-Solicitation Q&A » 26-FH1: Edge AI-V2X Integrated Practical Solutions for Congestion Prevention and Mitigation · Admin →
An error occurred while saving the comment
Du, Lili
commented
There is no preferred hardware-in-the-loop (HIL) testbed specified for Phase I. The proposers are encouraged to use the best testbed fitting the proposed integrative design.
Hardware-in-the-loop simulation testing is required in Phase I to demonstrate the feasibility of the architecture, critical components, and evaluate the benefits in traffic congestion mitigation under different scenarios. Virtual-only simulation may be acceptable where the proposed architecture is purely software- or firmware-based; however, the selected simulation approach should still credibly demonstrate system functionality and performance under representative conditions consistent with the Phase I objectives.
-
1 vote1 comment · U.S. DOT FY 2026 Phase I Pre-Solicitation Q&A » 26-FH1: Edge AI-V2X Integrated Practical Solutions for Congestion Prevention and Mitigation · Admin →
An error occurred while saving the comment
Du, Lili
commented
Human subject testing is not typically conducted during Phase I because it would require an IRB review. Accomplishing both of these within the timeframe of the six (6) month performance period of Phase I is not often tenable. Therefore, human subject designs and protocols rather than testing are usually included in Phase I proposals.
The topic description will be updated to clarify that actual testing is expected to take place during Phase II.
While the proposed approach is innovative, there are significant concerns regarding its feasibility for field implementation within the Phase II timeline. To be considered, the proposal must provide a concrete, high-confidence plan demonstrating how field deployment will be achieved.