Definition of success
What specific metrics define a successful proof of concept for Phase I is there a target residual voltage threshold, discharge time requirement, or safety standard we should design around?
2
votes
-
Joshua
commented
A successful Phase I project will demonstrate the feasibility of the proposed solution to eliminate or significantly reduce the inherent hazards of shipping end-of-life batteries. The technology should successfully lower overall transit costs while maintaining a high level of safety, thereby creating economic and operational incentives that encourage the domestic recovery and recycling of critical minerals from lithium-ion batteries.